Home/Articles/Regulations
Regulations5 November 2025·8 min read

Energy transition and HVAC: decarbonising buildings in 2026

Heat pumps, geothermal energy, district heating... HVAC solutions to decarbonise buildings and the opportunities for professionals.

🗺️ Find HVAC experts near you📋 Submit my project request
🌱
Metteur au Point Team
metteuraupoint.fr
Energy transition and HVAC: decarbonising buildings in 2026

Buildings account for 44% of final energy consumption in France and 25% of greenhouse gas emissions. The energy transition inevitably means transforming HVAC systems: replacing gas boilers with heat pumps, developing geothermal energy and connecting to district heating networks.

Key decarbonisation technologies

  • • Air-to-water heat pumps: COP of 3 to 5 depending on conditions, they are replacing gas boilers in new builds and renovations.
  • • Ground source heat pumps with boreholes: stable all year round (COP > 4), ideal for large commercial buildings.
  • • Urban district heating networks: supplied by biomass, geothermal energy or waste heat recovery. 900 networks in France.
  • • Solar thermal: for DHW production, alongside a heat pump. Covers up to 60% of DHW needs.
  • • Wastewater heat recovery: an emerging technology for apartment buildings and swimming pools.

What this means for commissioning engineers

  • • Heat pump expertise: commissioning, heating curve adjustment, verification of actual COP.
  • • Hybrid systems: managing the heat pump/gas changeover, optimising temperature thresholds.
  • • Low temperature: systems running at 40-50°C (underfloor heating, fan coil units) demand more precise balancing.
  • • Monitoring: low-carbon systems need instrumented monitoring to guarantee the expected performance.
FIELD TIP

The France Relance recovery plan and MaPrimeRénov' (French renovation grant) are speeding up the replacement of fossil-fuel boilers. It is a huge market for commissioning engineers specialising in heat pumps and energy retrofits.

The energy transition is not just a regulatory constraint — it is a profound transformation of the commissioning engineer's job. Professionals who build their skills in renewables and monitoring will be the backbone of this change.

Need an HVAC commissioning engineer?

Find qualified HVAC experts on the interactive map or post a project request.

Expert mapPost a project request

Are you a commissioning engineer?

Join the network of HVAC experts in France. Receive project requests, grow your business and raise your profile.

Join the network

Further reading

♨️
Heat pumps: types, COP, refrigerants and commissioning
Technology · 9 min
🏭
District heating: connection and commissioning of the substation
Technology · 6 min

Related articles

📋
RE2020: what does it mean for HVAC commissioning engineers?
6 min · 2 March 2026
📊
Tertiary Decree: obligations, deadlines and the role of HVAC
6 min · 28 August 2025
📖
HVAC standards and DTUs: the commissioning engineer's key references
7 min · 20 June 2025